Skip to content
LAB

Publications

405 works across 7 research areas

  1. Central figure from “Image Compression Augmented with a Learning-based Super Resolution Model”

    Image Compression Augmented with a Learning-based Super Resolution Model

    J. Xiong (opens in new tab), N. Chen, J. Wei, V. Mailthody

    · 2022

    Application No. 18/051,545 · US · Filed 2022-11

    AI Algorithms
  2. Central figure from “Explaining Outliers in Time Series and Evaluating Anomaly Detection Methods”

    Explaining Outliers in Time Series and Evaluating Anomaly Detection Methods

    Y. Zhu, J. Xiong (opens in new tab), J. He, L. Zheng, X. Cui

    · 2021

    Patent No. P202006954US01 · Filed 2021-02

    AI Algorithms
  3. Explicit Latency Control Notification for Edge Cloud Video Streaming Analytics Service

    H. Chen, J. Xiong (opens in new tab)

    · 2021

    Patent No. P202009164US01 · Filed 2021-01

    Cloud Computing
  4. Global Prosody Style Transfer Without Text Transcriptions

    K. Qian, Y. Zhang, S. Chang, J. Xiong (opens in new tab), C. Gan, D. Cox

    · 2021

    Patent No. P202102159US01 · Filed 2021-06

    AI Algorithms
  5. Neural Energy Saver: Model-Agnostic Input Transformation Learning for Adjusting Accuracy-Energy Tradeoff in Neural Networks

    P. Chen, N. Chandramoorthy, K. Swaminathan, J. Xiong (opens in new tab), D. Shah, B. Li

    · 2021

    Docket No. P202102795 · Filed 2021-07

    AI Algorithms
  6. Resource Constraint Aware Deep Learning Model Optimization for Serverless-based Inference Systems

    H. Chen, J. Xiong (opens in new tab), R. Huss

    · 2021

    Patent No. P202009250US01 · Filed 2021-01

    Cloud Computing
  7. Using Reinforcement Learning for Best Scaling Decision in Stateful Serverless Functions

    J. Xiong (opens in new tab), R. Huss, H. Chen

    · 2021

    Patent No. P202009568US01 · Filed 2021-03

    Cloud Computing
  8. Central figure from “Abstract Meaning Representation Parsing with Graph Translation”

    Abstract Meaning Representation Parsing with Graph Translation

    L. Wu, J. Xiong (opens in new tab), H. Gong, S. Bhat, W. Hwu

    · 2020

    Patent No. P202005821 · Filed 2020-12

    AI Algorithms
  9. Central figure from “Critical Path Analysis Of Activity Trace Files”

    Critical Path Analysis Of Activity Trace Files

    I. Chung, C. Pearson, J. Xiong (opens in new tab)

    · 2020

    Patent No. P201809363US01 · Filed 2020-01

    Systems
  10. Central figure from “Detecting Trojan Neural Networks”

    Detecting Trojan Neural Networks

    S. Liu, P. Chen, J. Xiong (opens in new tab), G. Zhang, M. Wang, R. Wang

    · 2020

    Patent No. P202002597US01 · Filed 2020-08

    AI Algorithms
  11. Method and System for Text Style Transfer Using Reinforcement Learning without Parallel Training Corpus

    S. Bhat, H. Gong, L. Wu, J. Xiong (opens in new tab)

    · 2020

    Patent No. P201910870US01 · Filed 2020-03

    AI Algorithms
  12. Method and System for Portfolio Management using Reinforcement Learning with Augmented Asset Movement Prediction States

    P. Chen, Y. Zhu, J. Xiong (opens in new tab), K. Bhaskaran, Y. Ye, B. Li

    · 2020

    Patent No. P201908998US01 · Filed 2020-09

    AI Algorithms
  13. System and Method for Analyzing Network of Tensor Time Series

    Y. Zhu, H. Tong, B. Jing, J. Xiong (opens in new tab), N. Gaur, A. Topol

    · 2020

    Patent No. P202009336 · Filed 2020-11

    AI Algorithms
  14. Central figure from “Crash Recoverability for Graphics Processing Units (GPUs) in a Computing environment”

    Crash Recoverability for Graphics Processing Units (GPUs) in a Computing environment

    I. Chung, Z. Qureshi, J. Xiong (opens in new tab), H. Franke

    · 2019

    Patent No. P201805445US01 · Filed 2019-04

    Systems
  15. Flatflash System for Byte Granularity Accessibility of Memory in a Unified Memory-storage Hierarchy

    A. Abulila, V. S. Mailthody, Z. Qureshi, J. Huang, N. Kim, J. Xiong (opens in new tab), W. Hwu

    · 2019

    Patent No. P201809609US01 · Filed 2019-06

    Systems
  16. Multi-perspective, Multi-task Neural Network Model for Matching Text to Program Code

    R. Haldar, L. Wu, J. Xiong (opens in new tab), J. Hockenmaier

    · 2019

    Patent No. P20190211US01 · Filed 2019-11

    AI Algorithms
  17. Central figure from “Providing Direct Data Access Between Accelerators and Storage in a Computing Environment”

    Providing Direct Data Access Between Accelerators and Storage in a Computing Environment

    Z. Qureshi, I. Chung, W. Hwu, J. Xiong (opens in new tab)

    · 2019

    Patent No. P201902114US01 · Filed 2019-10

    Systems
  18. Central figure from “Action Detection by Exploiting Motion in Receptive Fields”

    Action Detection by Exploiting Motion in Receptive Fields

    M. Do, R. Feris, D. Joshi, K. Mac, J. Xiong (opens in new tab), R. Yeh

    · 2018

    Patent No. YOR2201802545US01 · Filed 2018-05

    AI Algorithms
  19. A Method for Fast Path Traversal in a Relational Database based Graph Structure

    J. Xiong (opens in new tab), V. Zolotov

    · 2015

    Patent No. YOR820150630 · Filed 2015-05

    Systems
  20. Methods for Deep Learning Network Compression for Resource-constrained Devices

    W. Wu, J. Xiong (opens in new tab), V. Zolotov

    · 2015

    Patent No. YOR820151906 · Filed 2015-09

    AI Algorithms
  21. A Practical Method for Improving Runtime of CUBLAS Matrix Multiplication on GPU

    A. Lvov, J. Xiong (opens in new tab), V. Zolotov

    · 2015

    Patent No. YOR820150485 · Filed 2015-05

    AI Acceleration
  22. A Resource Supply-demand based Approach for Automatic MapReduce Job Optimization

    D. Kung, D. Phan, J. Xiong (opens in new tab)

    · 2015

    Patent No. YOR820150944 · Filed 2015-06

    Cloud Computing
  23. Optimal Capital Investment to Replace a set of Distribution Transformers

    G. Janssen, D. Phan, J. Xiong (opens in new tab)

    · 2014

    Patent No. YOR820140604 · Filed 2014-07

    Smart Energy
  24. Central figure from “Optimized Asset Maintenance and Replacement Schedule”

    Optimized Asset Maintenance and Replacement Schedule

    D. Phan, J. Xiong (opens in new tab)

    · 2014

    Docket No. YOR920140477US1

    Smart Energy
  25. Central figure from “System and Method to Reduce Human Activity Damage-induced Power Outage”

    System and Method to Reduce Human Activity Damage-induced Power Outage

    G. Janssen, J.R. Kalagnanam, J. Xiong (opens in new tab), Y. Zhu

    · 2014

    Docket No. YOR920140180US1 · Filed 2014-06

    Smart Energy
  26. Central figure from “Parallel Technique for Computing Problem Functions in Solving Optimal Power Flow”

    Parallel Technique for Computing Problem Functions in Solving Optimal Power Flow

    G. Ditlow, D. Phan, J. Xiong (opens in new tab)

    · 2013

    Docket No. YOR920130779US1 · Filed 2013

    Smart Energy
  27. Central figure from “Solving Satisfiability Problems through Search”

    Solving Satisfiability Problems through Search

    G. Janssen, J. Xiong (opens in new tab)

    · 2013

    Docket No. YOR920130647US1 · Filed 2013

    Electronic Design Automation
  28. Central figure from “Systems and Methods for Single Cell Product Path Delay Analysis”

    Systems and Methods for Single Cell Product Path Delay Analysis

    J. Bickford, P. Habitz, V. Iyengar, J. Xiong (opens in new tab), B. Worth

    · 2013

    Docket No. BUR920120074US2 · Filed 2013

    Electronic Design Automation
  29. Central figure from “Transformer Phase Permutation Causing More Uniform Transformer Phase Aging”

    Transformer Phase Permutation Causing More Uniform Transformer Phase Aging

    G. Ditlow, D. Phan, J. Xiong (opens in new tab)

    · 2013

    Docket No. YOR920130780US1 · Filed 2013

    Smart Energy
  30. Distributed System for Charging Electrical Assets

    S. Ghosh, D. Phan, M. Sharma, J. Xiong (opens in new tab), C. Wu

    · 2012

    Docket No. YOR820120121 · Filed 2012

    Smart Energy
  31. Central figure from “Enabling Statistical Testing using Deterministic Multi-corner Timing Analysis”

    Enabling Statistical Testing using Deterministic Multi-corner Timing Analysis

    B. Agrawal, D. Kung, J. Xiong (opens in new tab), V. Zolotov

    · 2012

    Docket No. YOR920110749US1 · Filed 2012-04

    Electronic Design Automation
  32. Method to Qualify Single Cell IP with Product Path Delay Analysis

    J. Bickford, P. Habitz, V. Iyengar, J. Xiong (opens in new tab), B. Worth

    · 2012

    Docket No. BUR820110268 · Filed 2012

    Electronic Design Automation
  33. Method to Re-center Manufacturing Line Using Performance Path Test

    J. Bickford, P. Habitz, V. Iyengar, J. Xiong (opens in new tab)

    · 2012

    Docket No. BUR820110245 · Filed 2012

    Electronic Design Automation
  34. System and Method for Interactive Energy Device for Environmental Stewardship

    G. Ditlow, B. Gaucher, C. Pickover, J. Xiong (opens in new tab)

    · 2012

    Docket No. YOR820110844 · Filed 2012

    Smart Energy
  35. System and Method for Acoustic Diagnosis Service

    J. Cohn, C. Pickover, J. Kozloski, J. Xiong (opens in new tab)

    · 2012

    Docket No. YOR820111274 · Filed 2012

    Systems
  36. System Performance Improvement Using Path Test

    J. Bickford, P. Habitz, V. Iyengar, J. Xiong (opens in new tab)

    · 2012

    Docket No. BUR820110246 · Filed 2012

    Electronic Design Automation
  37. Disposition of Integrated Circuits Using Performance Sort Ring Oscillator and Performance Path Testing

    J. Bickford, P. Habitz, V. Iyengar, D. Lacky, J. Xiong (opens in new tab)

    · 2011

    Docket No. BUR920110103US1 · Filed 2011-11

    Electronic Design Automation
  38. Test Path Selection and Test Program Generation for Performance Testing Integrated Circuit Chips

    J. Bickford, P. Habitz, V. Iyengar, D. Lacky, J. Xiong (opens in new tab)

    · 2011

    Docket No. BUR920110095US1 · Filed 2011-11

    Electronic Design Automation
  39. Central figure from “IC Chip At-functional-speed Testing with Process Coverage Evaluation”

    IC Chip At-functional-speed Testing with Process Coverage Evaluation

    E. A. Foreman, G. D. Grise, P. A. Habitz, V. Iyengar, D. E. Lackey, C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2010

    Patent No. US781448 · Issued 2010-10

    Electronic Design Automation
  40. Design Dependent Chip Disposition

    P. A. Habitz, J. Xiong (opens in new tab), V. Zolotov

    · 2010

    Docket No. YOR920100099US1 · Filed 2010-07

    Electronic Design Automation
  41. Central figure from “Method and Apparatus for Selecting Voltage and Frequency Levels for Use in At-speed Testing”

    Method and Apparatus for Selecting Voltage and Frequency Levels for Use in At-speed Testing

    M. J. Martinez, C. Visweswariah, F. C. Woytowich, J. Xiong (opens in new tab)

    · 2010

    Docket No. YOR920090565US1 · Filed 2010-01

    Electronic Design Automation
  42. Central figure from “Optimal Chip Acceptance Criterion and its Applications”

    Optimal Chip Acceptance Criterion and its Applications

    J. Xiong (opens in new tab), V. Zolotov

    · 2010

    Docket No. YOR9201000562US1 · Filed 2010-11

    Electronic Design Automation
  43. Central figure from “Ordering of Statistical Correlated Quantities”

    Ordering of Statistical Correlated Quantities

    C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2010

    Docket No. YOR920090353US1 · Filed 2010-01

    Electronic Design Automation
  44. System and Method for Statistical Delay Testing of both Process Variation and Single Random Delay Defects

    J. Xiong (opens in new tab), V. Zolotov

    · 2010

    Docket No. YOR920100405US1 · Filed 2010-11

    Electronic Design Automation
  45. Central figure from “Method, System, and Program Product for Computing a Yield Gradient from Statistical Timing”

    Method, System, and Program Product for Computing a Yield Gradient from Statistical Timing

    C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2009

    Patent No. US7480880 · Issued 2009-01

    Electronic Design Automation
  46. Central figure from “Method and Apparatus for Selecting Paths for Use in At-Speed Testing”

    Method and Apparatus for Selecting Paths for Use in At-Speed Testing

    C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2009

    Docket No. YOR920090333US1 · Filed 2009-10

    Electronic Design Automation
  47. Representing and Propagating a Variational Voltage Waveform in Statistical Static Timing Analysis of Digital Circuits

    S. Abbaspour, D. J. Hathaway, C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2009

    Patent No. US7620921 · Issued 2009-11

    Electronic Design Automation
  48. System and Method for Generating Test Patterns for Use in At-Speed Testing

    C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2009

    Docket No. YOR920090044US1 · Filed 2009-05

    Electronic Design Automation
  49. Central figure from “Yield Computation and Optimization for Selective Voltage Binning”

    Yield Computation and Optimization for Selective Voltage Binning

    C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2009

    Docket No. YOR920090517US1 · Filed 2009-10

    Electronic Design Automation
  50. Central figure from “System and Method of Criticality Prediction in Statistical Timing Analysis”

    System and Method of Criticality Prediction in Statistical Timing Analysis

    N. Venkateswaran, C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2008

    Patent No. US7437697 · Issued 2008-10

    Electronic Design Automation
  51. Central figure from “Method and apparatus for computing test margins for at-speed testing”

    Method and apparatus for computing test margins for at-speed testing

    C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2008

    Docket No. YOR920070614US1 · Filed 2008-01

    Electronic Design Automation
  52. Central figure from “Method and apparatus for statistical path selection for at-speed testing”

    Method and apparatus for statistical path selection for at-speed testing

    H. Fatemi, C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2008

    Docket No. YOR920070613US1 · Filed 2008-04

    Electronic Design Automation
  53. Reversible Statistical Maximum and Minimum Operations for Efficient Incremental Statistical Timing Analysis and Optimization

    D. Sinha, N. Venkateswaran, C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2008

    Docket No. YOR920080317US1 · Filed 2008-10

    Electronic Design Automation
  54. System and Method for Covering a Multilayer Process Space during At-speed Testing

    Y. Shi, C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2008

    Docket No. YOR920080547US1 · Filed 2008-12

    Electronic Design Automation
  55. Central figure from “Critical path selection for at-speed test”

    Critical path selection for at-speed test

    V. Iyengar, D. Lackey, S. Venkatesan, C. Visweswariah, J. Xiong (opens in new tab)

    · 2007

    Docket No. BUR920070146US1 · Filed 2007-11

    Electronic Design Automation
  56. System and method for incremental criticality and yield gradient computation

    C. Visweswariah, J. Xiong (opens in new tab), V. Zolotov

    · 2007

    Docket No. YOR920070374US1 · Filed 2007-10

    Electronic Design Automation
  57. An Extendable High-capacity Virtual Compact Disc File System: Construction Algorithms and Hardware Implementation

    J. Xiong (opens in new tab), J. Pei

    · 2004

    Patent No. CN 1137441C · China Patent · Issued 2004-02

    Systems
  58. Architecture and Implementation of a Plug-and-play High-capacity Virtual Compact Disc Storage System

    J. Pei, J. Xiong (opens in new tab), Y. Li, L. Pan

    · 2003

    Patent No. CN 1118758C · China Patent · Issued 2003-08

    Systems
  59. Seamless Integration of Multiple Storage Systems under One Target

    J. Pei, Y. Xiao, J. Xiong (opens in new tab)

    · 2002

    Patent No. CN 1094217C · China Patent · Issued 2002-11

    Systems
  60. A Multiple-driver-connected Compact Disc Library System under Single SCSI Logic Unit

    J. Pei, J. Xiong (opens in new tab), Y. Xiao

    · 2000

    Patent No. CN 1263310A · China Patent · Filed 2000-08

    Systems